Bikernet Banner

Updating the Bikernet Experience

Hey, Here’s the deal. We’ve worked and spent an entire year to move all Bikernet Free Content (16,000 articles) onto a fast-acting, mobile-friendly, google accessible, WordPress Platform. ...
Read More

The Amazing SHRUNKEN FXR Updated





Once upon a time there was a bike built called the Shrunken FXR. Keith “Bandit” Ball, of Bikernet and other assorted fame, built it. By a stroke of good fortune the bike became mine through the generosity and trust of Keith Ball.

This bike was my daily commuter for a handful of years. It was and is always a challenge and a ton of fun navigating the streets and freeways of Los Angeles on two wheels and especially on a custom built motorcycle.



I decided it was time to update the look of the bike as well as do some fine-tuning of a few mechanical items I wanted to switch up a bit. Below is a brief summary of what was done, again primarily with the help of friends and some extra cash from my Pops to help get it all finished up proper.



First I replaced the front fork tubes with new fork tubes made by Forking by Frank. Styles have changes, so I installed new handlebars, 10-inch baby apes mated to Black Boyd Motor Co. risers.



I work at the magnificent ARCH motorcycle company and LA Chop Rods, so natch; I installed Black Anodized hand controls by ISR purchased. They are absolutely the best and contain the mechanical Bandit approved styling.



I replaced the mirrors with 2-inch Blind spot jobs by CRG (Small and work great). We
Powder-coated the classic Performance machine wheels black (Thanks to Custom Metal Finishing in Gardena CA, who handle the high-end ARCH motorcycle extreme perfectionist coating).





We manufactured a new Shift arm and Brake arm to improve function. Ryan Boyd, Boyd Motor Co./Arch Motorcycle, is a master machinist and engineer. He configured then machined these components to enhance the rear brake functions, and it now works like a charm, plus it improved shifting dramatically.
We replaced the pegs with something sport bike like and again Ryan stepped up to design and machine one-off mounting bracket adaptors.



We reworked the exhaust basically back to the original first version, added BBQ paint and LA County Chop Rods baffles.
These upgrades, in addition to the rear shocks by Progressive and my comfy Saddlemen seat make the Shrunken FXR road ready and looking fresh for 2016.



Me owning this bike and updating would not be possible without the help and kindness of the following wonderful humans beings: Keith “Bandit” Ball, Dr. Ladd Terry, Gard Hollinger, Ryan Boyd, Jose Laguna, Saddlemen, L.A. County Chop rods, Custom Metal Finishing, Boyd Motor Co., Frank’s maintenance and engineering.



Here’s a link to the original feature, if you search the Shrunken FXR on Bikernet, you’ll find all the build articles: http://www.bikernet.com/pages/Amazing_Shrunken_FXRThe_Full_Feature.aspx

–Buster Cates

BIKERNET RESOURCES

The Magnificent ARCH motorcycle factory


LA Chop Rods


Saddlemen


BDL


Progressive Suspension


Read More

Bikernet Bike Build: BETSY’S REVIVAL STORY Part 2

 
     Oncethat trailer gate hit the driveway back at home I could see tired ol’Betsy begging for another chance at life! As I walked aroundthe trailer she lay resting after the 1500 mile journey back. Iassessed the impending task of making this Ol’ girl right again.
 
“Rode hard and put up wet,” I said to myself thinkingof all the journeys and adventures she served Scooter Tramp Scotty through.As I took in every line every worn out part of this soul servingmachine I tried to imagine all the places she saw, all thelandscapes, the women who made passenger, the endless white lines stretched for over half-a-million miles. The nomadicvessel of freedom that is this motorcycle I now have the honor ofsorting out to make whole again.
 
 
     Ilugged the broken pieces of this ’88 Electra Glide into the garageone by one. With an enthusiastic fire burning inside that I’vebecome a master at harnessing, I went straight to rearranging the shop foraccommodation of the new project. The work bench was clearedand the sorting of parts began, one-by-one. The bike “formallyknown as” Betsy quickly became a shell of her former self.The quest to get to her skeleton was my frantic goal, because there iswhere the worst lie waited to be healed. The evening faded to nightquickly and sleep was beckoning.

Tomorrow would be a new daybut with it came the disruptive chore of work so Betsy would laywaiting for my 6:30 return from the daily grind.
 
 
    Ipulled in to the house with anxious anticipation to strip her down tothat rusted and broken frame.As all parts lay categorized on the bench, I was left staring at 20years of grease and road grime thicker than the remaining paint theMoCo laid down 29 years prior. Before I could send this frameto repair, I had to get the layers of gunk off.
Thoughtsimmediately flooded my mind of just how many states and how manycountries this dirt belongs to! As I started scraping andcompiling clump by clump into the jar my imagination raced again intothe tapestry of visions stretching from Panama to Alaska where thistrusty companion carried her rider faithfully. I was holding inmy hand crust of the earth scooped up by Scooter Tramp Scotty’s gypsyjourneys traversing the entire North American continent for twodecades. WOW!
 
 
    Nowof course you know all of this has been documented in picturesthrough social media and through that incredible juggernaut I wasable to reach. I announced toFacebook land my intentions with Betsy and the response wasoverwhelming. This resurrection would only be possible withhelp of the great people who reached out to aid in thisreconstruction.
With the frame in real bad shape, it became my first and most important part of the restoration. An unsuspecting buddy reached out to me.Little did I know, he had been following the unfolding of theRevival of Betsy. Mr. Steve Brownell of Brownell Metal Studio, who has been a great friend of mine for a number of years extendedhis professional welding expertise. You see Steve has been inmetal manipulation for over 30 years doing high-end architectural andstructural work for some of Virginia’s finest establishments. Amaster welder and fabricator in every type of metal from brass,stainless, bronze, aluminum and steel, his craftsmanship is upperechelon in the industry.

     Bringingthis exhausted carcass to his hands of healing was a no brainer.I asked Steve, “Can you fix her road ravaged frame, brother?”He smiled ear to ear responding, “Of course I can.””I’ll have her back together better than the day sherolled off the assembly line.” My confidence in thisrevival mirrored the words from Steve’s mouth at that moment. Iknew this was the beginning of Betsy’s second coming!
 
 
     Stevewasted no time in tackling the task. Explaining to me how he had been followingScotty’s adventure, as many have, he was piqued by the ScooterTramp’s offbeat lifestyle and was excited to be a part of Betsy’srebirth. First line of business was tobead blast every square inch of the frame to expose any unseen rot or cracks laying camouflaged beneath the patina’d paint. Steve went towork uncovering what would soon become a little more than a brokenframe rail.
 
With three portions of the frame cracked and thebottom section of the frame rails looking like Swiss cheese, Stevecut out the cancered sections and replaced those portions withupgraded stainless steel meticulously melding the two metals togetherin one seamless blend of strength and integrity that won’t see rustagain at least in those portions. Hand shaping a few new panelsto replace and reinforce the swingarm junctures and a kickstand mountready for another twenty years of parking lot profiling, restorativefabrication COMPLETE!
 
Mr. Brownell even offered, as an addedbonus, to give her a two coats of primer, a fresh coat or three ofpaint, and shine her up with plenty of clear. She will onceagain be the prettiest girl at the ball or rally. I only sawthe process in pictures as you are now, but all I can sayis..AMAZING! Putting thirty plus years of quality experiencebreathing new life into a piece of true biker Americana, SteveBrownell, executed flawlessly.
 
 
     Igot the call about a week after drop off– the surgery was asuccess. The following morning I anxiously drove out toBrownell Metal Art Studio anticipating the unveiling of Betsy 2.0.Upon arrival I had that knot in my stomach as if meeting a girl forthe first time..fucking motorcycle..it was like the morning ofChristmas as a child all over again.
 
As I walked into the shopSteve met me upon entering with a shit eating grin, I knew it wasgoing to good. I said to him, “I see things went well.”
 
He replied, “Piece of cake.”
 
We walked over to theother half of the shop and lying in the middle of the floor restingon a piece of cardboard as to preserve the fresh paint from beingdamaged, sat the old girl. At first glance, I searched for arusted worn out hunk of metal until my gaze fell upon the gleam ofthe newly painted frame sparkling under the shop lights.
 
HOLYSHIT!..I couldn’t believe what I was seeing I had to double take.As I walked over to inspect Steve’s handy work I looked back at himreciprocating the same “shit eating” grin. I wasfloored. Having to remind myself that this is indeed the samerusted wore out tubes of iron I dropped off a week earlier. Wetook our time and carefully loaded the fresh chassis into the truckmaking sure all was secure and photos were taken.

      Ahuge expression of gratitude goes out to my friend Steve Brownell forselflessly donating his time and materials to bring this GypsyMachine back from the dead. As a fellow biker himself Stevereiterated to me a manta I hear and have used time and again, “That’swhat we do, brother.” With a new lease on life I closedthe tailgate behind the NEW girl, gave Steve a big appreciative hug,then drove off waving as I watched Steve and the crew in the rearview sending us on our way to future adventures yet to come.

 
 
     Onthe ride back home I glanced behind me whispering, as if that framewas my girlfriend, in no time she will feel whole again.
 
“She’s a cheating Bitch,” Scotty.
 
Read More

Bennett’s Performance Dyna Build, Part Two

It took a while before the call shook the receiver on the wall.
 
“We’re ready, finally to move onto the next stage,” Eric said, and I slipped across congested Long Beach on Pacific Coast Highway to the base of Signal Hill, where the clean offices of Bennett’s Performance and Branch O’Keefe reside in an alley.
 
There’s a bit of a dichotomy here. When you say Pacific Coast Highway, you immediately have visions of the sea splashing against white sand. That’s not the case when PCH skirts through the Los Angeles Harbor area behind container ships, container trucks, and container trains Terminal Island and through the concrete jungle of Long Beach packed with steel supply joints, body shops, junk yards, stucco Mexican fast food joints, and dingy bars. Sure, once you weave south of Long Beach, the coast comes into view again and islands, marinas, and white sand can one again be seen.

Sorta the same equation in reverse fits Bennett’s. They are located on an alley, but it’s about as clean and wide as a comfortable two-lanner, and the buildings are pristine and orderly. Hell, there’s even some landscaping bordering the buildings. Eric and his dad keep the shop tidy and it’s open and painted white on the interior and the exterior. Makes it easy to take tech shots.

So we got to work. Eric hadn’t ridden his own motorcycle in six months, broke up with his girlfriend three times, and needed his two-wheeled Valium. Working with D&D, they altered a stock D&D system to fit ’91 to ’13 Dynas. The heat shield was modified and the system was ceramic-coated for a long-lasting satin black. He also had to modify the mounting bracket for the performance pipe system. Eric is going to share his mods with the D&D gang so they can make adjustments to their manufacturing process for these model years.

Eric’s first move was to avoid a potential problem with the 5-speed tranny main shaft inner primary race. They occasionally drift inwards from the inner primary toward the tranny main shaft seal and damage the threads. A malady solution included installing a JIMS inner primary bearing upgrade Kit.

Here’s what the JIMS team has to say about it: Thinking of running an open primary system, or looking for added durability in your high output engine? JIMS now has a double-row ball-bearing with seal and retaining ring kit.

For use on 1990 to 2006 FLH and FXST, and on 1990 to 2005 Dyna models or any 5 or 6-speeds using H-D bearing No. 9135.

Note: Not compatible with Bandit clutch kits.

Eric used his Custom Cycle Engineering swing arm punch to remove the stock bearing. Then he used JIMS tools, including the race puller No. 34902-84 and the seal installer No. 967, to press in the bearing to the perfect depth. The JIMS kit removes the main-shaft bearing race.

With the bearing pressed in perfectly, Eric installed the snap ring with the flat side toward the transmission, then the JIMS seal. It was time to install the inner primary using 22 foot-pounds of torque on the 5/16 bolts with a dab of blue Loctite.

He was ready to install the new Rivera Pro Cutch, but first he had to press out the stock clutch hub. The performance differences in the clutches were obvious. The difference in the fiber surface areas was substantial. For big-inch motorcycles, the more surface contact area, the better.

Per the Rivera/Primo instructions, we needed to soak the Rivera clutch plates in ATF transmission fluid before assembly. “If we don’t, Ben Kudon, from Rivera will bust my balls,” Eric said trembling. Per the instructions, we soaked them for 10-15 minutes.

While waiting, we installed the stock compensating sprocket using a 2.5-inch socket and Loctite, and the primary chain adjuster. Eric installed the clutch hub with a 1 3/16 socket, being careful to handle the left-handed threads. Then he installed the first thick steel plate into the hub, followed by a fiber, then steel, and then another fiber plate.

Eric runs ATF fluid in his primary. With the pressure plate in place, the diaphragm and the retainer, the clutch was a done deal. “Don’t over-tighten the fasteners against the locking ears,” Eric pointed out.

Eric uses JIMS guide pins to hold gaskets in place, so the primary could be slid into place without fighting the gasket. They are easy to make, or just buy a set the perfect length from JIMS. He tightened the stock primary to 120-inch-pounds of torque.

Between the last time I darkened the Bennett’s Performance door and this point, Eric and John O’Keefe from Bennett’s Performance had a brain fart to machine only Twin Cam cylinders to give them a drag bike appearance. Eric volunteered to be first and tore his engine apart again.

[page break]

John O’Keeffe has a special lathe fixture designed to hold cylinders in place while boring. He used the same fixture to turn these cylinders down slightly, but not enough to hamper cooling.
 
“It’s a looks-only modification,” said Paul, at Branch O’Keefe. “It gives them a stout look.” The cost is about the same as boring, about $200 a set. “If a customer wants, they could have their cylinders powder-coated or treated first before machining.”

John O’Keefe has given this signature look a new name: Branch Race Cut Cylinders. Eric chose to be the trial run and they cause a stir around the shop. Currently, the Branch team doesn’t have enough cylinders to offer an exchange service, but you can send your cylinders out, and depending on the shipping service you select, get them back within a week.

At this point, we installed the S&S intake manifold per the instructions with the S&S G series shorty carb.
 
“The new S&S intake manifolds are perfect,” Eric said. “This one aligned perfectly with the stock ports and the inside surface was smooth and finished. Branch didn’t need to touch it, unless you want that polished look.”

He installed the carb with the isolator block and new S&S O-rings dry. “If the surfaces are in good shape,” Eric said, “you don’t need grease or sealants. They just cause problems for the next mechanic.”

We took a break, since Eric was working with a Speed Merchant and Alloy Art on a couple of custom products, plus a couple of items needed powder-coating. Eric was anxious for final assembly and to fire the monster for the first time and go for a ride.

When I returned, Eric was installing a new H-D floating rotor on the rear wheel of his bike. “You can’t install the rear wheel until you pull the wiring into place.” Eric pointed out the wiring pocket in front of the rear wheel cavity, which is very tough to reach with the rear wheel in place. “Only ’05 and earlier Dynas were set up this way. It’s a pain in the ass.”

Okay, this may get a tad confusing, but I’ll do my best. Alloy Art is a machine shop and they build parts for companies like Speed Merchant and Harley-Davidson. They machined these Speed Merchant triple trees for Dynas, in keeping with Buell configuration and agile handling. You can see the difference.

He greased the neck bearing and the Timken, and began to slip the fully adjustable stock forks into place. With the dust shield in place, the top triple tree was added.

Eric chose to run Alloy Art super clean rear turn signals, no fronts, and an Alloy Art tight billet headlight and grips. He also installed good and tight Alloy Art urethane riser bushings. Next came his own headlight mount bracket and the Alloy Art billet headlight, plus his handlebars and controls, and the Dakota Digital dash, speedo, tach, and data acquisition system. Then he pulled the stock wiring harness runs into place under the rear fender and installed the stock wiring plugs.

The Alloy Art rear turn signals required drilling one hole for a signal wire. Then it was a matter of installing his pre-ordered Goodrich front and rear brake lines. He installed and adjusted the pull throttle cable first, then the push. He slipped chunks of ½ inch black shrink tubing over the dual throttle cables and used them as guides. Once the cables were run and comfortable, he used a heat gun to tighten the shrink-wrap.

 
 
 
We were getting close. He would use a vacuum bleeder later to bleed the brakes. Finally, he installed the new S&S air cleaner with the bracket for the choke lever in place.
 

 

 

 
These puppies are well-designed to include a velocity stack element for enhanced airflow and throttle response and ease of maintenance. It was a breeze to install, and then Eric checked all of his fluids, installed a stock H-D battery, and bada-bing it fired to life.

He is pilling on the miles (585 as we speak). Next, we will bring you dyno results, and then a feature after he adds some final details. “I love the way it runs,” said Eric.
 
It’s not a show bike, but a hard-riding hot rod build with all the finest mechanical elements. We will report on all the results from the dyno, the streets, and seat of the pants. Hang on!

Sources:

Bennett’s Performance

Rivera Primo

S&S

Branch O’Keefe

Alloy Art
TEL: 626 963 5021
FAX: 626 335 3685
CONTACT@ALLOYART.COM
154 S. VALENCIA ST.
GLENDORA, CA 91741

Speed Merchant
www.thespeedmerchant.com
info@tsmracing.net

Custom Cycle Engineering
 

Read More

How to replace grips on a Harley-Davidson by J&P Cycles

Today, J&P Cycles shows you how to replace grips on a Harley Davidson motorcycle. From removing your old grips and adding new grips watch the entire process take place.In this video they use a 2013 Harley Davidson Softail Slim for demonstration but the process will be very similar for all motorcycles that utilize dual throttle cables.

Advertisement
Read More

Rebirth of an American Classic: Transmission Rebuild

 
My 3-speed transmission started out very similar to my engine, an empty case and a pile of parts, all in need of cleaning.  So the first step was to break everything down into individual pieces and perform a thorough inspection of each piece, to see which parts just needed cleaning and which parts needed repairs or replacement.
 
 
Luckily most of the parts were in good shape, even the transmission studs, so everything was put into the blasting cabinet.  It’s always important to note that you don’t want to blast bearing surfaces and fine threads, so these areas need to be covered before the part goes into the blast cabinet.  After a couple of hours of blasting, the results speak for themselves.
 
 
Next a coat of paint was sprayed on all the external parts (except the case).  Some parts were Cadmium plated from the factory, but a layer of silver paint was a quick way to approximate the original finish.
 
 
While the paint was left to dry, work began on assembling the internal components of the transmission.  I decided to upgrade the mainshaft bearings to sealed units which are available from Replicant Metals (www.replicantmetals.com).  Using sealed bearings helps to eliminate fluid leaks, which is always a worthwhile improvement.  In order to install the new bearings, the case was carefully heated with a torch to expand the opening while the bearings were placed in the snow to contract.  Once the case was hot, the bearing was quickly dropped in and tapped into place with a wooden dowel.
 
Both my countershaft and mainshaft were well worn, so I replaced them with new units from Eastern Motorcycle Parts (www.easternmotorcycleparts.com).  My slider gear was in terrible shape too and was replaced with a new unit from Eastern as well.  Here’s a side by side photo of my original slider gear and the Eastern replacement.  Definitely is big improvement! 
 
 
  Assembly was very straight forward, the mainshaft was slid partially into the case, allowing room for the main drive gear and slider gear to be installed, before the mainshaft was slid the rest of the way through the case.
 
 
Next new bearings were installed inside the cluster gear and it was held inside the transmission case while the countershaft was pushed through it.  Lots of red grease was used for this step, not only to lube the new bearings, but to hold them in place as some of them rode loose inside the cluster gear.  
 
 
The last thing to install inside the case was the shift fork assembly.  The shift fork attaches to the center of the slider gear and slides back and forth on its own shaft.  An arm in the transmission lid moves the shift fork, which in turn moves the slider gear and engages it with the selected gear on the gear cluster.
 
 
With the internals finished, work began on the kicker assembly.  Using a special lock ring, both the mainshaft and countershaft were secured on the right side of the transmission before the kicker parts were added to the mainshaft. 
 
 
Assembling the parts on the mainshaft was a two man job as there was a spring which had to be compressed while two keys are installed in the end of the mainshaft.
 
 
Once everything was stacked onto the mainshaft, a nut and washer was installed to hold the whole assembly in place.  The following photo shows the assembly ready for the kicker cover to be installed.
 
 
Inside the kicker cover and attached to the end of the kicker arm is a half gear which meshes with the kicker gear that was just installed on the end of the mainshaft.  This half gear turns the mainshaft when you kick down on the kicker pedal.
 
 
A paper gasket and a handful of washers and nuts was all that was needed to complete the kicker installation.  There was a little bit of work left to assemble the transmission lid and it was soon bolted onto the top of case.  
 
 
A couple of new grease fittings finished off the build and we were left with a great looking transmission.
 
 
Editors Note:
If you would like to contribute to the completion of this bike please use the link below.
 
This project started on Black Friday of 2013 with just a set of engine cases and will end with a complete 1933 Harley-Davidson VL making a cross country run in the fall of 2014.  Already a great deal of progress has been made on the restoration of this motorcycle, but more funding is needed to see this project through to the end.
 
Additional articles will continue throughout the remainder of this build and will result in a complete digital archive which takes the reader through the restoration of a 1933 Harley-Davidson, step by step.  By making this information available freely online, future vintage motorcycle enthusiasts will be able to rebuild and maintain these great machines.

We have already gained the support of many of the top compaines in the vintage motorcycle industry.  If you would like to see your company’s logo included not only on the motorcycle, but also on every article, please contact me directly to learn more about our marketing campaign and advertising opportunities. EMAIL

 
Sponsored By
 
 
 
 
 

 
 
 

Read More

The Mudflap Girl FXR Saga

It all started when a brother was desperate for cash and I bought a basket case Dyna, and with the help of JIMS machine turned it into an FXR. I started to build it for my son, Frank, the tattoo artist, around an old Kenny Boyce-styled pro street frame. Making progress on this build, with a massive upside down Custom Chrome front end, a brother stumbled into my shop and told me about Paul Cavallo and Spitfire Motorcycles.

Paul’s been around the industry for a couple of decades. When the economy tanked, he hung on with his dad and started Spitfire motorcycles. He was struggling and a brother thought I could help by using a couple of his Spitfire components on a Bikernet.com build. I went to visit Paul and was inspired by his non-stop drive to create new components daily, build world-class old school chops for customers, and kick ass at shows all over the country.

Then I was hit with the bike builder blues. My girlfriend left and I was forced to sell my 2003 Road King, leaving me with a ratty rigid Shovelhead and a Bonneville racer to ride. I needed a new girl and a long distance rider. Too often, around the campfire we debated twin cams versus Evos and most of the bros confirmed the solid stature of the FXR configuration. A plan formulated to build myself another FXR. I returned to Paul’s shop to cut a deal on a chassis for myself. Both were stretched, almost single-loop, long-distance riders with Spitfire Girder front ends.

Paul’s team built my chassis in pure traditional FXR style and Frank’s in the pro street configuration. We re-manned Frank’s FXR engine in black and chrome, and I ordered a bone-stock crate H-D 80-inch Evo. Both transmissions were rebuilt by the JIMS crew to be 6-speed overdrive units. I went with chain final drive and Frank used a stock belt.

The overwhelming concept revolved around building a bike that’s a chopper to the bone, but could be easily ridden across the country. My stretched gas tank holds well over three gallons, the oil tank contains nearly four quarts of oil, and I installed an oil cooler for heat waves. The Spitfire bars are held in place with Custom Cycle Engineering dog bone rubber-mounted classics.

I used Contrast Cut Performance Machine grips and pegs for style, yet road comfort. The bike is rubber-mounted for vibration-free riding. I worked closely with David Zemla of Progressive suspension until we configured a shock system capable of affording me some suspension with somewhat limited travel.

The girder is an uplifting quandary. With the Spitfire structure I could feasibly install almost any shock system, with whatever spring rate I decided on. I’m still messing with the gas-operated Rockshox.

I’m missing the best part, the Saddlemen seat. This seat was carefully configured at the Saddlemen manufacturing facility in Los Angeles, from the heavy-duty fiberglass seat pan to the spine-relieving slot, to the better than foam gel, and the ultimate breathing resilient fabric. That puppy is amazing.

The engine is virtually stock with the exception of a Bennett’s Performance-installed Andrews Cam, S&S oil breather gear, and Branch flowed heads, all their state-of-the-art valves and springs, and intake manifold. I ran an Andrews EV-27 cam and Andrews chrome-moly adjustable pushrods for less flex, a new cam bearing and the Branch flowed stock heads, for 8.9:1 compression, 78 cc Branch-flowed chambers, and 75-80 horses at 2,600 rpms.

The bike was built specifically for the road, but with chopper styling. I can’t leave anything alone, or ride a stock bike. It’s against my nature, but I can ride a scooter that will get me there comfortably in style.

For the first time in my bike-building life, I built this bike in bare form, wired it, and rode it for almost eight months. The benefits are immense, since I could make changes and adjustments throughout this road or rode research period. It gave me an extended period to investigate color schemes, build the front fender, break stuff, repair, and outright replace components, including my goofy chain guard.

It’s odd, but even with 2,000 miles under her belt, I still came up with last-minute changes during the paint and powder process. I added a keyless ignition system from Digital Dawg, which proved to be a safety and security feature. The drawback to riding a bare vehicle for an extended period included rust and oil management.

Still, when I assembled the bike for the final time, I ran into rear powder-coated fender expansion, and adjustments to the position of my one-off Spitfire oil bag to prevent chain damage. Maybe a rear belt would have been a wiser decision, maybe not.

Finally, the Mudflap Girl represents the open road. She represents the drawbacks of industry when it takes our girls away from us. And lastly she represents the desire to find our Mudflap Girl at home or down the road.

 

 

IRONWORKS EXTREME TECH CHART

Specifications
 

Name: Keith “Bandit” Ball
Owner: Lt. Ball
Builder: Ballintsky

GENERAL
 

Year, Make & Model: 2012 Mudflap Girl FXR
Assembly/Builder: Ballorama
Timeline: 8 months

FORKS
 

Year/Model: 2012 Girder
Builder: Paul Cavallo, Spitfire Motorcycles
Type: Girder
Triple trees: Spitfire
Extension: 9 inches over stock

ENGINE
 

Year/Model: 2011 H-D
Rebuilder: New
Displacement: 80 cubic inches
Lower End: assembled by S&S
Balancing: S&S
Pistons: H-D
Cases: factory
Heads: Branch O’Keefe
Cams: Andrews
Lifters: S&S
EFI/ Carb: Trock modified CV
Air Cleaner: Roger Goldammer
Pipes: D&D
Ignition: Crane Hi-4

TRANSMISSION
 

Year/Modifications: 2012 JIMS overdrive 6-speed
Engine sprocket: BDL
Trans sprocket: JIMS 23-tooth
Wheel sprocket: 51-tooth
Secondary drive: Biker’s Choice chain

FRAME
 

Year: 2012
Designer/Builder: Paul Cavallo/Spitfire Motorcycles
Rake/Stretch: 5 inches up, 2 out

ACCESSORIES
 

Bars: Spitfire
Risers: Custom Cycle Engineering dog bones
Fenders: Bar Knuckle/Toby/Bandit front, Biker’s Choice rear
Gas Tank: Biker’s Choice
Oil Tank: Spitfire
Headlight: Old spot
Taillight: Donkey from Biker’s Choice
Speedo: Wire Plus
Pegs: Performance Machine Contrast Cut
Electrics: Wire Plus, Digital Dawg (keyless), Biker’s Choice
Seat: Custom by Saddlemen

WHEELS/TIRES
 

Front Wheel: Metalsport
Front Tire: Avon
Size: 19

Rear Wheel: Metalsport
Rear Tire: Avon
Size:
Hubs: Metalsport
Rotors: Metalsport
Brakes: GMA

PAINT
Bodywork/Molding: none
Painter: Chris Morrison and George the Wild Brush
Color: Super silver
Powdercoating: Worco silver and asphalt satin black

Sources:
 

Biker’s Choice

BDL

Custom Cycle Engineering

D&D Exhaust

JIMS

MetalSport

S&S

Saddlemen

Spitfire

Wire Plus

Read More

Rivera-Primo Brute II Install

We have a goofy Shovelhead in the Bikernet shop called the 1928 Shovelhead. It has 21-inch wheels front and rear in a Paughco rigid frame, but some 1928 elements were used, including the re-pop semi-flat sided tanks, the rear fender and perhaps the seat. The bike was conceived by Bandit the bastard, built by the crew at Rick Fairless’ Strokers Dallas, with the help of Randy Simpson who manufactured the handlebars.

The bike has contained a couple of hiccups and hasn’t been ridden much. Recently, one of Bandit’s friends needed a ride, so Bandit shipped this puppy to Washington. Richard Kransler installed new Avon tires and took it out for a spin. Unfortunately, the early Rivera-Primo belt, stuffed into the semi-stock inner primary, snapped and the 1984 Shovelhead was garaged. More recently, Richard concocted a deal with Bandit for a van in exchange for his Sturgis Shovel, and returned the 1928 Shovelhead to the headquarters, where the gang went to work on it.

With Richard’s info, and after consulting with Ben Kudon at Rivera-Primo, a plan was put into motion to make this wild puppy more rideable. We needed to add an oil filter, rerun the oil lines to reduce heat, fix the sumping problem, replace the primary drive, and then we discovered a loose valve seat, but we’ll get to that.

This is also a two-part tech. We first installed the Brute II Extreme Belt drive with a 1 ½-inch wide 11mm belt with electric start in the closed primary. Then we will install the most magnificent Rivera-Primo Pro Clutch. Since this is a jockey shift, it will be interesting to test both the stock clutch against a new clutch system that’s state of the art. We will forward all of our extensive reports directly to the boss and all Bikernet readers.

We discovered immediately that the front Brute II pulley was larger than the previous model, which was disappointing because it called for more clearance in the case, which weakened one of the primary fastener locations. Not a big deal, so we went to work with a pneumatic cut-off blade and emery wheels.

It’s critical to disconnect the battery, especially while working on the inside of any Shovelhead primary. It’s too easy to bump or pull on the starter solenoid, and you could lose a finger pronto. Fortunately, we have a selection of JIMS tools and pullers for this operation.

Here’s the fine print from Rivera-Primo: Primo Belt Drives are designed and engineered to correctly fit stock Harley-Davidson motorcycles. Aftermarket frames, primary covers, engine shafts, or clutch hubs may cause installation problems. Also bent frames, sagging motor mounts, worn transmission mounts, and other defects may cause shortened belt life due to incorrect pulley alignment.

If you have a stock system being replaced, here’s the dope: Remove the front pulley, chain, compensator and chain adjuster. Remove oil lines to primary and plug or clamp to prevent leakage. Cut the chain oiler hose 3 inches from the oil pump and permanently plug it. All belts must be run completely dry, without lubrication of any kind. Therefore, remove all oil from inside the primary covers.

The spacer behind the front pulley should be removed before installing the belt drive. This spacer may or may not be required to correctly align the pulleys. If a spacer is needed for alignment, various sizes are available from your local Primo-Rivera dealer (part number PX-1, is a package of various sizes).

We discovered a very tight belt. We had to carefully install the belt in the case first. Then the front pulley was installed onto the main shaft, but just slightly to afford us some flexibility with the clutch hub. We re-greased the bearing on the clutch hub and inside the clutch shell. With the handle of a plastic hammer, while prying it with a large screwdriver, we were able to drive the clutch shell over the hub with some gentle persuasion.

We tracked the belt, and installed the same spacer from the last system behind the engine pulley. With the bike jacked and the plugs pulled, we turned the engine over to test the running direction. We made sure to run the engine over in a forward direction. It’s not a bad idea to use a straight edge at first to make sure the pulleys have the proper spacing.

“Spacing the motor pulley outward will cause the belt to track towards the outer primary cover,” said Ben. “If spaced too far out, the belt will rub on the inside of the clutch shell.

Then we attempted to install the outer, aftermarket tin cover and discovered a significant problem. It rubbed against the clutch shell. So far, our inner primary clearance adjustments worked.

We were concerned about the tightness of the belt. It seemed severe to us, and to Bandit. According to the Brute II directions, the belt requires a minimum of ½-inch up and down play at the center of the belt, and up to ¾-inch. We barely encountered ¼-inch of tough play. “Free play is critical,” Ben said, but when Bandit questioned him, he muttered something about ¼-inch being okay, since the belt was so stiff.

The crew even considered replacing the system with a stock chain, to avoid issues. We took the system apart and studied each element, and investigated. I looked into a longer belt, or installing the earlier unit again, which had its benefits with the smaller engine pulley and tapered clutch shell that fit in the primary. We installed the belt again and tested the flex—still tight. We cut a hole in the tin primary, eliminated that problem and affording us tremendous venting. We live and breathe by the Optimist Creed, sort of code of the west. We are hoping once the belt settles in and warms, we will encounter additional flex and no stress on the engine and trans bearings.

“This is a much stronger, more technically advanced belt over the previous 14mm belt,” Ben assured me. We will give it a shot. Venting is a critical element. Primo recommends venting enclosed belt installations to allow cool air to circulate into and out of the primary case. This will keep heat expansion to a minimum and extend belt life.

Special Note: Big Twins from 1969 require a #16657 motor seal. Next we will install the new Pro-Clutch from Rivera Primo and test it, so we will be in and out of this primary case and reporting back on our findings.

In the meantime, we rerouted the oil lines, added an oil filter mount, and an oil pressure gauge for more capacity, cooling, and cleaner oil. We worked on the sumping problem, and then discovered that a valve seat was loose in the rear head. We pulled the heads and delivered them to Branch O’Keefe for repairs.

Our shop intern and overall handy-man, Kyle Olsen, our official Bikernet electrician, will test this bike. We are determined to make it a solid rider, and Kyle will bring us reports and handling complaints in the near future.

We modified the jockey shift and added the 5-Ball for easy shifting that’s out of the way of our thighs at stops.

And Bandit has a code, a good one. All bikes need rear chain guards, and this bike doesn’t have one. We will remedy that. Plus we have a brand new set of Nology plugs and plug wires to install. Hang on for the next report.

Read More

Timbo’s ’64 FL Restoration (Part One)

Not too long ago, my good friend Timbo approached me with a proposition, restore his 1964 Harley FL, I agreed. Problem was, it’s in a box, literally! So after a brief discussion on exactly what we wanted to do, how much it would cost and the possible value at the end of the rainbow, I started the Hard Ride back from Hell with the old ’64. I picked up the bike, basically a roller and all the boxes of parts that came with it. As you probably expected, this will be a frame up restoration as close to factory specs as I can get it.

There will be some minor changes, which I’ll talk about as we go along. First thing was to lay it all out and take inventory to see what was missing. After some research, I found replacing parts for the ’64 surprisingly easy thanks to J&P Cycle, Biker’s Choice, and the internet. I ordered the Vintage catalog J&P Cycle puts out and started researching parts I needed to replace.

I also found a local polishing company and chrome hardware supplier (needmorechrome.com) to make life easier. Tear down was a snap. Make sure you bag or box all your parts as you go and label what they are, and in some instances what order they go in. It’s not a bad idea to take lots of photographs for future reference. Sometimes a parts manual comes in handy.

After tear down, I started the fun stuff, going through each and every part, each nut and bolt and cleaning them. Some parts and hardware will not be salvageable, so you’ll have to replace them with either new, or good condition used. I found that there is a tons of vendors on line for just about everything you need. Buying new parts from the catalog is not always the best answer, especially if you’re on a budget like I am.

So shop around, do some research, you may be able to save as much as 50% sometimes. You will also need repair manuals and a few restoration guides like the one my friend Bandit sent me for reference from Wolfgang publishing, thanks Bandit. It has been very useful so far. This is the first of many articles on this restoration project. As the months progress, I’ll try and give you a detail look at what’s involved with a full-blown restoration.

Tail Gunner out for now, see ya next month!

 
Read More

Mudflap Girl FXR Part 12—She meets S&S

Here’s the link to Mudflap Girl Part 11: http://www.bikernet.com/pages/Mudflap_Girl_FXRs_part_11_The_First_Road_Test.aspx

My son’s Mudflap Girl FXR is running and partially broken in. I even, finally, dialed in the Wire Plus Speedometer, and it’s working. I wish I knew what I was doing wrong, but that puppy works like a champ. I enjoy the tightness of the display and ease of installation. In that small cylindrical Wire Plus display, I get a speedo, a tach, trip gauge, neutral light, turn signal indicators, oil idiot light, and what else?

Okay, so it’s time to turn the Pro Street version of the Mudflap over to my son, Frank, but first we couldn’t leave the bone stock remanufactured 80-inch Evo engine alone. I reached out to S&S for a cam recommendation, and they recently built a relationship with Crane Cams.

Bruce recommended the following stock engine formula: S&S Super E carb, Crane Hi-4 ignition, S&S Cam and S&S easy-adjust pushrods, a Crane dual-fire coil, and the S&S 33-4250 breather and shim kit, for just enough pump to let this motor breathe.

I hauled the Mudflap beast on my Kendon tilt-up combo trailer to Bennett’s Performance, a very clean shop, next to Branch O’Keefe Flowmetrics, on Signal Hill. Eric Bennett, the boss, bought the Bikernet Hearse, immediately fired his girlfriend and started to cruise the backstreets of Long Beach. He traded his bagger for a Sons of Anarchy Dyna, and is about to turn the 88-inch twin cam into a 106-inch S&S night flier. His band, the Signal Hill Billies, transformed their usual light country western twang into dark blues. What the hell did I do? We will bring you reports on his engine transformation. I could swear the all-black lowered hearse smirks at me whenever I roll into his parking lot, but we won’t go there.

I pulled up the other day to find Frank’s Mudflap Girl on a lift center stage. No sooner did I enter the shop when Eric slipped out the back. A mysterious tech sauntered out of the engine room with long gray hair. “Don’t take my picture,” he said, “and don’t mention my name in the article.”

I’ve known him a long time. He’s an experienced Bonneville racer and a multiple-tour Vietnam vet, about my age. He’s only been married once, and is still married to the same woman. “I swear,” he said, “I’ve never pulled my military issue bayonet on my wife.”

I’ve been married five times and Eric three, and he just broke up with his long-time girlfriend. Maybe the graybeard tech with his twisted grin was trying to say something.

What the hell could I say? I set the box of parts on the lift and started to blow the dust off the fresh engine. Eric gave me a new cone gasket, seal, and a Torrington cam bearing, in case the fresh engine was fitted with a poor quality INA bearing—it was. I removed the pipes. The tech removed the plugs, and we jacked up the bike. He popped the pushrod covers and broke out the bolt cutters to remove the stock pushrods without removing the rocker boxes.

“I roll the engine over so the valves are closed when I cut the pushrods,” Graybeard said, “so the valves don’t slam shut when the pushrods snap.”

Then he removed the point cover, and the crane Hi-4 ignition plate. “There needs to be a washer under the fastener holding the Crane point breaker plate,” he barked.

Unfortunately, I had installed the Crane system and breaker plate—my bad. I thought about my fifth wife. He pulled the cone cover with a rare Trock tool, since the master is no longer with us.

With a couple of JIMS magnetic, or H-D lifter tools the lifters were held out of the way while he pulled the stock cam and checked the bearing.

Sure enough, it was an INA cam bearing with about half the rollers of the high quality Torrington cam bearings.

JIMS tools makes a handy cam bearing puller, which was installed, and swiftly, perfectly yanked the stock bearing free. Eric made specific machined aluminum drivers for installing new bearings, which were carefully tapped into place. After it was installed, he reached in to make sure the bearing spun free, with no binding.

Next, he aligned the timing marks on the pinion gear and set up the new S&S breather gear.

Steel breather gears have better dimensional stability than plastic gears. Embedded particles can damage the crankcase breather gear cavity. A screen provides better protection than a slotted gear, so small particles are prevented from entering the gear cavity, where they may damage the gears and oil pump.

The S&S steel gear with welded in screen with larger diameter holes provides improved air flow/oil scavenging from the flywheel cavity. Crankcase flywheel cavity vacuum and oil scavenging are further improved by optimized breather window timing. Breather oil trap scavenging is significantly improved by increased scavenge port duration. These improvements are the result of exhaustive research using digital sampling and data acquisition equipment.

This gear was the standard size for late 1977—‘99 Harley-Davidson big twins. Breather gear kits include breather gear and steel endplay shim kit.

With the new S&S breather gear installed, he started to adjust the endplay with a .120 shim. “That’s usually the one,” he said. As it turned out, we went with .110-inch shim after he checked the fitment with a straight edge. Then he performed a similar operation with the cam to check endplay. We discovered that a .055-inch thick shim was needed in addition to the existing flat shim. He dug around and found one, and we were set to test it with another JIMS special tool.

The S&S 510V bolt-in cam works well with stock or ported heads. The improved ramp design results in low valve train noise. It’s meant for engines up to 96 inches and with compression as high as 10:1. It’s designed to pull its best results in the mid to upper rpm range, 3000 to 5000 rpm.

It was time to set the cam timing with the pinion bearing and breather gear slots. Then the mystery tech cleaned some of the case threads with a tap. “Too much Loctite,” he said. He touched all the stock ¼-20 Allens with blue Loctite and installed the cone and torqued them to 110 inch-pounds. He installed the appropriate washer in my breaker plate, and then the timing plate.

Before he removed the Crane Hi-4 ignition plate, he scribed the plate and the case so the timing would be right where I placed it when everything was put back together—that is, if I didn’t fuck it up in the beginning.

I peeled the S&S quick-adjust pushrods out of their vacuum-packed container and shortened them for ease of placement. These S&S jobs were a breeze. He checked for all the needed pushrod gaskets, and we compared the pushrod lengths to use the short ones on intake valves and the long ones for the exhaust.

“I adjust them the old school way,” he said. “I make sure one intake lifter is at the top of its cycle, and then adjust the other. Then visa-versa.” He waited 20 minutes between adjusting valves for the stock lifters to bleed down, but while he waited, we started to install the pipes. “No time to lose.” He made sure each pushrod would spin after it bled down. In each case, he took the slack out of the pushrod and then turned it out four turns or 24.5 flats. Once he tightened the pushrod lock nuts, he would take the half flat out of the adjustment.

Here’s the Quickee Pushrod Supplement from S&S: To install S&S quickee pushrods, thread the jam nut off the threads towards the ball end and screw the adjuster into the pushrod tube until the threads disengage and the pushrod can be collapsed

When installed and adjusted, S&S Quickee Pushrods must have a minimum thread engagement of .500 or half an inch (Pushrod tube to Adjuster, not including the jam nut) or severe damage to the pushrod as well as your engine may occur.

When adjustment is complete, the jam nut must have full thread engagement with the adjuster screw. If you do not have full engagement, the pushrod is not correct for the application or position.

S&S Quickee Pushrods for S&S Shovelhead and all big twin engines contain two long and two short pushrods. All Sportster model and Harley-Davidson twin Cam 88 pushrodes are the same length.

We replaced the pushrod cover clips with another JIMS tool, and I finished installing the Spitfire brake master cylinder and pedal. Once together, we turned on the gas, hit the starter and it fired right to life. Our very experienced Vietnam vet tech let her warm up, adjusted the carb and quietly returned to the engine room to work on a twin cam engine build for a customer. It’s time for my son to pick up his bike and head for a paint shop or the hills.

 

Sources

S&S

Bennett’s Performance

Wire Plus

JIMS

Spitfire

Read More

Sturgis Shovel Gets A Wrap

 
The Sturgis Shovel has seen its share of LA Harbor town back alleys in the eight years of pounding the streets around Wilmington, California. The exhaust is really starting to show the effects of the road and weather. Originally these hand fabricated pipes were painted with barbeque paint found lying around the Bikernet Intergalactic Headquarters. Surface rust was starting to take hold, and I really needed to do something about it. The Sturgis Shovel was built to be a “Take no crap, back alley brawler,” so shiny powder coating or chrome just wasn’t going to cut it. I had to research my options and come up with a quick and simple, yet great looking backyard solution to my problem.

 

I decided I would sand the pipes down to bare metal and spray them with VHT High Temp, Flat Black Exhaust Paint. Then I contacted J&P Cycles for a 50-foot roll of Design Engineering Inc., 2-inch Titanium Exhaust wrap and called it a day.
 
 
Once you have the pipes removed from the bike, getting the rust and old paint off is the first step. How you go about this is completely up to you, send them out for media blasting, grab your DA sander and some 120 grit, or do what I did, just pull up a lawn chair, with some 120 grit sandpaper and go to it. How you get to bare metal isn’t important, but getting there is, if you want a good looking final product.

 

Now, we were ready for painting or so we thought. Before you get your spray cans out make sure to degrease the freshly sanded metal with either a metal prep or lacquer thinner. There are a lot of high heat exhaust paints out there and you can use which ever brand you feel most comfortable with. I decided to go with VHT FLAMEPROOF COATING in flat black. Here’s what they say about their product:
 

 
 

VHT FLAMEPROOF COATING

VHT FlameProof Coating will renew and extend the life of any surface exposed to extremely high temperatures. This unique coating is a matte finish, silicone ceramic base widely used by the automotive industry on exhaust systems and the aerospace industry for jet engines, re-entry vehicles and other high temperature applications. VHT FlameProof Coating will withstand temperatures up to 2000°F (1093°C) and is ideal for use on headers, exhaust systems, or wherever an extreme temperature coating is needed.

Specs:
 
Temperature: 1300°F-2000°F (704°C-1093°C)

Applications: Headers, Exhaust Manifolds, Piston Domes, Inside Heads

Finish: Flat

Painting an exhaust pipe should be a simple thing, but getting them in a position that does not require you to have the flexibility of a Hollywood stripper, to paint all the surfaces can take some thought. I decided to hang it from the rafter of my patio awning which allowed me to climb all around it without having to throw my back out.
 
Spraying the VHT FLAMEPROOF paint is much like spraying any other spray paint. Keep the can moving, from about 8 to 10 inches away, and remember multiple light coats are better then one heavy coat. ‘
 
VHT recommends multiple coats with only a 10 or 15 minute time between coats if you get sidetracked and come back to spray your second or third coat after more then an hour you should wait 7 days for the paint to surface cure before you apply your next coat. So make sure that Hollywood stripper I was discussing earlier doesn’t sidetrack you or this step could take awhile.

 

VHT FLAMEPROOF COATING does require curing and VHT includes some specific instructions on how to do this.

Curing FlameProof

VHT FlameProof Coating only attains its unique properties after correct curing (refer to instructions on the can).

Off the Vehicle
 

Paint must be completely dry before curing
Heat to 250°F (121°C) for 30 minutes
Cool for 30 minutes
Heat to 400°F (204°C) for 30 minutes
Cool for 30 minutes

Heat to 650°F (343°C ) for 30 minutes
 

Caution: Do not exceed the temperature of the least heat tolerant component or the base metal

On the Vehicle
 

Paint must be completely dry before curing
Run at idle for 10 minutes
Cool for 20 minutes
Run at idle for 20 minutes
Cool for 20 minutes

Run under normal operating conditions for 30 minutes
 

Using the household oven was going to be a non-starter, between the pipes not fitting and the wife giving me absolutely no doubt as to what her thoughts were… I looked at the barbeque. This made perfect sense as the pipes would fit, and I do have a temperature meter on the barbeque. Unfortunatel that option was not going to be allowed either. This left me with few options and as the Sturgis Shovel is currently tore down getting a top end rebuild, curing will need to wait until after the pipes were wrapped with the DEI exhaust wrap and the Shovel was ready to ride again.
 
Note: I am not sure how this will turn out, so I recommend following VHT’s instructions or just not let the wife know what you plan to do with her oven. I will post an update as to the outcome of this experiment once the Shovel tears up the streets once more.
 

 

Once I finished painting and curing(?) the exhaust pipe, it was time to get wrapping. J&P Cycles has a large selection of exhaust wrap to choose from in their online catalog and after looking at all the different options I decided to order the Design Engineering Inc, Titanium Exhaust Wrap Part #308-159. I also had them throw in a package of DEI’s 8-inch Stainless Steel tie wraps to secure the ends.

The DEI Titanium wrap has some great benefits over other exhaust wraps on the market. I could tell you all about its awesome carbon fiber look, or how it doesn’t need to be wetted down before wrapping. But I will instead just let the guys at Design Engineering Inc. fill you in on the details.
 
 
 
 

Titanium exhaust wrap, with LR Technology, is made from pulverized lava rock and stranded into a fiber material and woven into a proprietary weave. Titanium wrap is engineered to be stronger than most wraps and more durable for improved thermal performance and reliability. Perfect for any automotive or motorcycle application!
 
•Withstands 1800°F direct/2500°F intermittent heat 

•Promotes increased flow for improved performance
•Reduces temperature & vibration breakdown
•Extremely pliable for a tight and secure wrap
•DEI HT Silicone Coating not required
•Pre-wetting roll not necessary for wrapping
•Hi-tech carbon fiber look

•High resistance to abrasions, oil spills, temperatures and vibration breakdown
pasting
 
(Note: Design Engineering HT Silicone Coating Spray is NOT recommended for DEI Titanium Wrap.
 

As usual my order from J&P Cycles showed up almost as fast as I hit the enter key on the order form. Once the wrap arrived I looked over DEI’s directions and proceeded to start wrapping the pipe.

To start the process you first must decide which direction you want the overlap to be facing as it will effect the look.

 

 

I decided I liked the look of the overlap facing the front of the bike so I started my wrap at the rear of the pipe.
 

 
 
Once you have made a couple of complete wraps of the pipe use a plastic zip tie to temporarily secure the exhaust wrap. Pulling the wrap tight, keep wrapping the pipe overlapping about ½- inch, at the bends you will need to stretch the wrap and vary the overlap to get a smooth wrap. Just keep wrapping until you get to the end. Keeping the wrap tight is critical to the looks of the finished product. We don’t want any loose, flapping in the wind exhaust wrap do we?

 

There are plenty of different ways you can do it. I prefer to wrap the exhaust wrap around the pipe pulling it tight as I go, other people will tie one end of the exhaust wrap to an immovable object and roll the exhaust pipe onto the stretched wrap. Both ways will work, so try it out and see which way works best for you.
 
When you get to the exhaust flange or the end of the pipe, if you decided to wrap your pipe backwards cut the wrap about 1-inch long and fold it under to hide any fraying using another zip-tie to secure this end. 
 
 

Now that you are finished wrapping the pipe and are happy with the results, it is time to replace those zip-ties with either Stainless Steel Zip-ties or Stainless Steel hose clamps they will both get the job done and look good doing it at the same time.
 

 
 
 

Well that wraps it up. Now, if only I could install the bastards and go for a ride…
 
 
 
Read More
Scroll to Top